|
|
|
|
Provide
multi-level or single process by analyzing
characteristics of waste water and
optimizing various unit processes
as following.
1) Electric chemical decomposition
system
2) AOP altitude waste water treatment
3) Active carbon regeneration system
4) Soil cleaning technology ¡ª under
research (Will be commercialized by
2004)
|
|
|
|
1) Major
Core Technologies
- Material science
- Electrochemical reactor design
- Electric Pole Catalyst (Electro-Catalyst)
2) Characteristics of Kyungwon¡¯s Electric
Pole
- Durability and chemical safety,
low current consumption, various effects,
high preference level
- Low expense
|
|
|
|
1) Treatment
Efficiency
- Can remove more than 90% of BOD,
COD, SS, n-Hexane, heavy metals, T-N,
T-P,
Color and others
- Maximized waste water treatment
amount for a unit time
- Existing physiochemical treatment,
pretreatment for biophysical treatment
and
altitude treatment
2) Operation Management
- Greatly reduced chemical agent using
amount compared to existing chemical
treatment
- Amazingly reduced operation expense
due to reduced sludge generation amount
- Non-specialist may operate it
3) Treatment Facility
- Since it is compact, it may be installed
at narrow space and existing space.
- Fully automated system
4) Electric Pole Consumption
- Soluble Electric Pole ¡ª 5 months
? Insoluble Electric Pole ¡ª Longer
than
2 years
5) Chemical Agent Consumption and
Sludge Generation Volume
- Within 20% of existing chemical
agent using amount, 50% reduced sludge
generation
6) Electric Power Usage
- Determined by sewage density
|
|
|
|
|
|
1) Electric
Pole Load: 20A¡500A for electric pole
1m2
2) Materials Available for Treatment
- COD, BOD, TOC, SS, Surfactant, N-Hexane,
Chromaticity, Cu, Zn, Pb
- Ni, Hg, Al, Cr, Benzene, Toluene,
Xylene, Styrene, Nitrogen, Phosphorous
and
others
3) Electric Power Consumption
- 20 V ¡¿ 20 A ¡ 500A/§³ (1 Electric
Pole)
- Soluble Electric Pole : Annually
exchange 2 times
- Insoluble Electric Pole: Longer
than 2 years
4) Achievement
|
|
placing
an order |
construction |
treatment |
year |
Wooil
Marine Co. |
Janghang Factory
wastewater treatment construction
|
250§©/day |
2001 |
Jeltek
Co.
|
Busan
Factory
wastewater treatment
construction |
1500§©/day |
2001 |
PILOT
Manufacture |
50§©/day |
2001 |
Samyang
Commerce Co. |
Gunpo Factory
wastewater treatment
construction
equipment change - 2 case |
- |
2001 |
Nongshim
Co.
|
Anyang
Factory
wastewater treatment
construction |
1000§©/day |
2001 |
Clean
water treatment
construction |
900§©/day |
2001 |
Samjung
Pulp Industry |
Pyungtaeck Factory
water treatment
construction |
10,000§©/day |
2001 |
Buan-Gun
Sanitaryreclamation |
Waste settling
water treatment
construction
Electrolytic Oxidation System
|
100§©/day |
2002 |
Asefood
Co. |
Ansung Factory
water treatment
construction |
200§©/day |
2002 |
Jeltek
Co. |
Busan Factory
ION EXCHANGER UNIT |
6§©/day |
2002 |
Nongshim
Co. |
Asan Factory clean
water,
soft water construction |
50§©/day |
2002 |
Donga
paper manufacture |
Jungeup Factory
cleanwater treatment
construction |
3000§©/day |
2002 |
Nonghyup
Chungbuk circulation |
Chungju
wastewater treatment
construction
Aqueduct equipment construction Electrolytic
Oxidation System
|
50§©/day |
2003 |
|
5. Technology
and Certification: Obtained NT Mark |
|
|
Summary |
|
Advantage |
Electrolytic
Oxidation System:
Oxidation resolution reaction using
electric energy Use principle
|
|
-Can
remove more than 90% of BOD, COD,
TN, TP
-Convenient operation and management
-Convenient system installation
-Long lasting battery life
-Little chemical agent consumption
and sludge
-Small electricity usage
-Quick treatment speed with strong
oxidation reaction |
|
|
|
Reserve
Osmosis System:
Use the principle of pressure and
basement membrane
|
|
-Improve
treatment efficiency
-Can recover available materials
-Reduce energy consumption |
|
|
|
Membrane
Creature Reaction System:
Use membrane creature reaction principle
|
|
-Reliable
system
-Advanced treatment capacity
-Long system lifecycle
-Economical maintenance with small
device at high capacity
-Minimized installation space (50~70%
of existing device¡¯s installation
space) |
|
|
|
|
|
|
- Obtained
NT Mark |
|
|
|
|
|
|